Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 315249011
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $1,785.00
Current Penalty: $2,278.50
Issuance Date: 04/04/2011
Nr Instances: 2
Nr Exposed: 1
Abatement Date: 08/11/2011
Gravity: 01
Report ID: 0729300
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/26/2011 | $2,278.50 | 08/11/2011 | Serious | |
| Penalty | Z: Issued | 04/04/2011 | $1,785.00 | 08/11/2011 | Serious |
Translate