Violation Detail
Standard Cited: 5A0001 OSH Act General Duty Paragraph
Inspection Nr: 314838798
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $4,620.00
Current Penalty: $4,620.00
Issuance Date: 12/13/2010
Nr Instances: 1
Nr Exposed: 14
Abatement Date: 12/23/2010
Gravity: 05
Report ID: 0418300
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Text For Citation: 01 Item/Group: 001 Hazard: STRUCK BY
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish to each of his employees a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to his employees in that employees were exposed to a struck-by hazard: a. On or about 10/21/10 - maintenance shop, the one ton Budgit underhung hoist was not marked with the rated load. b. On or about 10/21/10 - welding shop, the Dayton underhung hoist was not marked with the rated load. Among other methods, one feasible and acceptable method to correct this hazard would be to comply with the requirements of the American Society of Mechanical Engineers Standard, ASME B30.11-1998, Monorails and Underhung Cranes.ng
Translate