Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 314598897
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $700.00
Current Penalty: $350.00
Issuance Date: 08/24/2010
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 09/10/2010
Gravity: 02
Report ID: 0653510
Contest Date: 10/21/2010
Final Order: 12/30/2010
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 12/30/2010 | $350.00 | 09/10/2010 | Serious | |
| Penalty | Z: Issued | 08/24/2010 | $700.00 | 09/10/2010 | Serious |
Translate