Violation Detail
Standard Cited: 5A0001 OSH Act General Duty Paragraph
Inspection Nr: 314240474
Citation: 01001
Citation Type: Serious
Abatement Status: A
Initial Penalty: $3,150.00
Current Penalty: $2,362.00
Issuance Date: 09/28/2010
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 10/22/2010
Gravity: 05
Report ID: 0316700
Contest Date: 11/10/2010
Final Order: 02/16/2011
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 02/16/2011 | $2,362.00 | 10/22/2010 | Serious | |
| Penalty | Z: Issued | 09/28/2010 | $3,150.00 | 10/22/2010 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard: STRUCK BY
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a struck-by hazard from exploding display fireworks: (a)Buck Swank Stadium behind Palmyra Area Middle School - The employer did not adequately protect employees from the hazard of ground level explosions of aerial shells. Employees fired Lidu 3-inch peanut shells (two-break aerial shells) from HDPE mortars positioned in wooden mortar racks. One of the peanut shells malfunctioned and exploded at ground level, blowing apart its mortar and wooden rack and prematurely lighting off additional aerial shells, one or more of which also exploded at ground level. Flying shrapnel from the ground level explosions caused injury to an employee, on or about July 4, 2010. Among other methods, one feasible and acceptable abatement method to correct this hazard includes not firing multiple-break shells from mortar racks as specified in the National Fire Protection Association NFPA 1123 Code for Fireworks Display, 2010 Edition, Section 4.5.2 "Single-break shells greater than 8 inches in. (203 mm) in diameter and multiple-break shells shall not be fired from mortar racks." VERIFICATION REQUIREDTION