Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 313763930
Citation: 01001
Citation Type: Serious
Abatement Date: 08/24/2011 X
Initial Penalty: $3,500.00
Current Penalty: $2,000.00
Issuance Date: 08/18/2011
Nr Instances: 1
Nr Exposed: 22
Related Event Code (REC):
Gravity: 05
Report ID: 0213100
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/09/2011 | $2,000.00 | 08/24/2011 | Serious | |
Penalty | Z: Issued | 08/18/2011 | $3,500.00 | 08/24/2011 | Serious |