Violation Detail
Standard Cited: 19100036 A03 Design and construction requirements for exit routes.
Inspection Nr: 313751190
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $1,350.00
Current Penalty: $1,350.00
Issuance Date: 02/18/2014
Nr Instances: 4
Nr Exposed: 2
Abatement Date: 03/14/2014
Gravity: 01
Report ID: 0257250
Contest Date: 03/17/2014
Final Order:
Related Event Code (REC):
Emphasis:
Translate