Violation Detail
Standard Cited: 5A0001 OSH Act General Duty Paragraph
Inspection Nr: 313525768
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,500.00
Current Penalty: $1,250.00
Issuance Date: 05/17/2010
Nr Instances: 3
Nr Exposed: 1
Abatement Date: 06/30/2010
Gravity: 10
Report ID: 0523400
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/11/2010 | $1,250.00 | 06/30/2010 | Serious | |
| Penalty | Z: Issued | 05/17/2010 | $2,500.00 | 06/04/2010 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard: ELECTRIC
Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that: (a)In the north side of High bay, Drill Press Department, Budgit Ton Jib Hoist had the pendant had electrical tape wrapped around the electrical wires. The pendant was not supported in a manner that would protect the electrical conductors exposing employees to electrical hazards. (b)In the Machine Shop by the Drill Press & Chucker Area, Budgit Ton Jib Hoist pendant was not supported in a manner that would protect the electrical conductors. (c)In the Machine Shop by Warner & Swasey Automatic Chucker, Ton Capacity Lodestar Hoist pendant was not supported in a manner that would protect the electrical conductors. Among other methods, feasible and acceptable means to correct these hazards are to use a safer alternate method such as ensure the pendant control was properly supported as outlined in ASME Overhead Hoist (Underhung) B30.16-2003, Section 16-1.2.3(d) a pendant station shall be supported in a manner that will protect the electrical conductors or air hoses against strain. Any pendant station that might present a hazard to the operator, if a ground fault occurs, shall be grounded. Certification, and documentation/evidence of abatement is required. Certification of abatement is required by 29 CFR Part 1903 and is to be submitted within ten (10) calendar days after the abatement date.ment