Violation Detail
Standard Cited: 19100036 E01 Design and construction requirements for exit routes.
Inspection Nr: 313159485
Citation: 01001
Citation Type: Serious
Abatement Status: I
Initial Penalty: $2,250.00
Current Penalty: $2,250.00
Issuance Date: 12/02/2009
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 12/07/2009
Gravity: 03
Report ID: 0214200
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis: