Standard Cited: 19100119 D03 IB Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 313015380
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $4,500.00
Current Penalty:
Issuance Date: 10/19/2010
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/12/2010
Gravity: 10
Report ID: 0524530
Contest Date: 11/12/2010
Final Order: 06/10/2011
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/10/2011 | 11/12/2010 | Serious | ||
| Penalty | Z: Issued | 10/19/2010 | $4,500.00 | 11/12/2010 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard: REFINERY
29 CFR 1910.119(d)(3)(i)(B): Process safety information pertaining to the equipment in the process did not include the piping and instrument diagrams (P&ID'S): At WRB Refining, the company did not ensure the Piping and Instrumentation Diagrams were correct and up to date. On DWG E48395, the 2 inch bypass line coming off of the Warm Product Separator had two block valves; one was labeled car-sealed closed (CSC) while the other valve downstream was not labeled on the P&ID as car-sealed open (CSO). ***ABATEMENT DOCUMENTATION IS REQUIRED FOR THIS ITEM IN ACCORDANCE WITH THE REQUIREMENTS OF 29 CFR 1903.19(d)***