Standard Cited: 19100119 D02 IA Process safety management of highly hazardous chemicals.
Inspection Nr: 312487457
Citation: 01001
Citation Type: Serious
Abatement Status: W
Initial Penalty: $5,000.00
Current Penalty: $7,000.00
Issuance Date: 07/08/2009
Nr Instances: 1
Nr Exposed: 26
Abatement Date: 08/10/2009
Gravity: 10
Report ID: 0317000
Contest Date: 07/28/2009
Final Order: 01/17/2012
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/17/2012 | $7,000.00 | 08/10/2009 | Serious | |
| Penalty | Z: Issued | 07/08/2009 | $5,000.00 | 08/10/2009 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard: REFINERY
29 CFR 1910.119(d)(2)(i)(A): Process safety information pertaining to the technology of the process did not include accurate block flow diagram(s) or simplified process flow diagram(s): a) Sunoco (MH), 10-4 Plant - The current simplified process flow diagram #26529A,for the Fraid Stack did not show that SV-20C relieved to the stack as per P&ID 1-10-4, 26005A, sheet #14. 2/2/2009. NOTE: DOCUMENTATION OF ABATEMENT OF THIS CONDITION IS REQUIRED