Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 312459258
Citation: 01001
Citation Type: Repeat
Abatement Status: X
Initial Penalty: $800.00
Current Penalty: $800.00
Issuance Date: 09/18/2008
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 09/03/2008
Gravity:
Report ID: 1055350
Contest Date: 09/29/2008
Final Order: 12/17/2008
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 12/17/2008 | $800.00 | 09/03/2008 | Repeat | |
| Penalty | Z: Issued | 09/18/2008 | $800.00 | 09/03/2008 | Repeat |
Translate