Violation Detail
Standard Cited: 19100119 D03 ID Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 312412166
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $3,500.00
Current Penalty: $3,500.00
Issuance Date: 02/25/2010
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 03/30/2010
Gravity: 10
Report ID: 0854910
Contest Date: 03/30/2010
Final Order: 03/10/2011
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/10/2011 | $3,500.00 | 03/30/2010 | Serious | |
Penalty | Z: Issued | 02/25/2010 | $3,500.00 | 03/30/2010 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard: REFINERY
29 CFR 1910.119(d)(3)(i)(D) Information pertaining to the equipment in the process shall include relief system design and design basis; (a) At the time of the inspection, Thursday, October 22, 2009 through Monday, February 22, 2010, of Tesoro Refining and Marketing Co. 474 W. 900 N. Salt Lake City, UT, Compliance Officers reviewed written process safety information (psi) for the crude unit pressure relieving system. The psi did not include the design information for operating pressures of steam powering P-112, which is a piece of equipment used in the system. Tesoro's written response to a data request dated February 22, 2010 states "Tesoro has not established maximum or minimum operating pressures for the steam system..". Serious injury or death could occur due to not using proper design or design basis for relief systems.