Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100066 G01 Powered platforms for building maintenance.

Inspection Nr: 311909758

Citation: 01001

Citation Type: Other

Abatement Status: X

Initial Penalty: $2,125.00

Current Penalty: $2,125.00

Issuance Date: 02/10/2009

Nr Instances: 1

Nr Exposed: 5

Abatement Date: 02/25/2009

Gravity: 03

Report ID: 0830500

Contest Date:

Final Order:

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 03/05/2009 $2,125.00 02/25/2009 Other  
Penalty Z: Issued 02/10/2009 $2,125.00 02/25/2009 Serious  

Text For Citation: 01 Item/Group: 001 Hazard: STRUCK BY

Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish a place of employment which was free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to struck by hazards: (a)Sears Auto and Tire Center at 205 E. Foothills Parkway, Fort Collins, CO 80525: On or before 1/16/09, the employer did not ensure that the Dayton 1,000 pound hoist, model 5W659, used to lift the tire conveyor, was free from the following recognized hazards: 1)The hoist did not provide for over-travel protection in accordance with the American Society of Mechanical Engineers (ASME) standard B30.16 - 1993 for Overhead Hoists (Underhung) Section 16-1.2.14: "The hoist shall be so designed and constructed that the load hook, either loaded or empty, shall not exceed the upper limit of travel." 2)The hoist braking system did not stop and hold the load hook when the controls were released in accordance with ASME B30.16 - 1993 Section 16- 1.2.11(b)(1)(a); 3)The supporting structure was not designed to withstand the loads and forces imposed by the hoist for the rated load in accordance with ASME B30.16 - 1993 Section 16-1.3.2. The hoist was anchored to some angle iron used to support some heaters, and there was no assurance that this anchorage point could support the tension placed upon it by running the hoist load hook into the drum, along with the weight of the load, and the weight of the heaters; 4)The hoist did not include a marking to depict its rated load on the hoist or load block in accordance with ASME B30.16 - 1993 Section 16-1.1.1; 5)The hoist was not frequently inspected in accordance with ASME B30.16 - 1993 Section 16-2.1.2, at least monthly; 6)The hoist was not periodically inspected in accordance with ASME B30.16 - 1993 Section 16-2.1.3, at least annually, and who makes records of external conditions to provide a basis for a continuing evaluation in accordance with ASME B30.16 - 1993 Section 16-2.1; and 7)The hoist was not centered over the load except when authorized by a qualified person in accordance with ASME B30.16 - 1993 Section 16-3.1.2. Abatement Note: Abatement certification is required for this item (See enclosed "Sample Abatement-Certification Letter"). Among other methods, some feasible and acceptable abatement method are stated in ASME B30.16 - 1993, as referencing above.ncing

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close