Violation Detail
Standard Cited: 19100036 A01 Design and construction requirements for exit routes.
Inspection Nr: 311295604
Citation: 01001
Citation Type: Serious
Abatement Date: 04/16/2008 X
Initial Penalty: $1,625.00
Current Penalty: $975.00
Issuance Date: 04/04/2008
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity:
Report ID: 0452110
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/08/2008 | $975.00 | 04/16/2008 | Serious | |
Penalty | Z: Issued | 04/04/2008 | $1,625.00 | 04/16/2008 | Serious |