Violation Detail
Standard Cited: 19100036 C02 Design and construction requirements for exit routes.
Inspection Nr: 310113527
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $2,500.00
Current Penalty: $2,500.00
Issuance Date: 07/11/2006
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 08/13/2006
Gravity:
Report ID: 0355112
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate