Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 308660570
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $1,250.00
Current Penalty: $1,250.00
Issuance Date: 05/03/2005
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 05/11/2005
Gravity: 03
Report ID: 0215000
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
Translate