Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 308596105
Citation: 01001
Citation Type: Repeat
Abatement Status: X
Initial Penalty: $4,000.00
Current Penalty: $4,000.00
Issuance Date: 03/21/2005
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 02/17/2006
Gravity:
Report ID: 1055330
Contest Date: 04/15/2005
Final Order: 01/27/2006
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | J: ALJ Decision | 01/27/2006 | $4,000.00 | 02/17/2006 | Repeat | |
| Penalty | Z: Issued | 03/21/2005 | $4,000.00 | 02/24/2005 | Repeat |
Translate