Violation Detail
Standard Cited: 5A0001 OSH Act General Duty Paragraph
Inspection Nr: 307687335
Citation: 01001
Citation Type: Serious
Abatement Date: 02/16/2005 X
Initial Penalty: $1,875.00
Current Penalty: $1,218.75
Issuance Date: 01/14/2005
Nr Instances: 22
Nr Exposed: 7
Related Event Code (REC): C
Gravity: 03
Report ID: 0215800
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/01/2005 | $1,218.75 | 02/16/2005 | Serious | |
Penalty | Z: Issued | 01/14/2005 | $1,875.00 | 02/16/2005 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard: LIFTING
capacity markings. 4.Assembly, Pole H79, on or about 11/10/04: A below-the-hook lifting device attached to a CM Lodestar 1/2 ton overhead hoist had no rated load capacity markings. 5.Heat Treat, on or about 11/17/04: A below-the-hook lifting device attached to a CM Lodestar 1/2 ton overhead hoist had no rated load capacity markings. Among other methods, one feasible and acceptable abatement method to correct these hazards is to: 1.Mark the rated load of the lifting device on the main structure or equivalent in accordance with ASME B30.20-1993, Section 20-1.2.1. b)The following overhead hoists had broken or missing hook safety latches: 1.Scrape Area for Bridgeport, Pole L97, on or about 11/9/04: A Budgit 1/2 ton overhead hoist had a missing safety latch at the hook attaching the hoist to the trolley on the jib. 2.Bridgeport Area, Pole K97, on or about 11/9/04: A Budgit 1/2 ton overhead hoist had a missing safety latch at the hook attaching the hoist to the trolley on the jib. 3.Bridgeport Area, Pole J97, on or about 11/9/04: A Budgit 1/2 ton overhead hoist had a missing safety latch at the hook attaching the hoist to the trolley on the jib. 4.Bridgeport Area, Pole H95, on or about 11/9/04: A Budgit 1/2 ton overhead hoist had a missing safety latch at the hook attaching the hoist to the trolley on the jib. 5.Manual Mills, Pole K41, on or about 11/17/04: A CM Lodestar 1/2 ton overhead hoist had a missing safety latch at the hook attaching the hoist to the trolley on the bridge crane. 6.Matsuura Area, between Poles P35 and P37, on or about 11/17/04: A CM Lodestar 1/2 ton overhead hoist had a broken safety latch at the lifting hook. Among other methods, one feasible and acceptable abatement method to correct these hazards are to: 1.Install new safety latches on the hooks in accordance with ANSI B30.16-1993 Section 16-1.2.9. c)The following monorails, bridges and/or jibs had no rated load capacity markings on them, the pendant controls were not kept legible and the supporting structures for the hoists were underrated for what the hoist capacity was rated for: 1.Scrape Area for Bridgeport, Pole L97, on or about 11/9/04: A jib crane with a Budgit 1/2 ton overhead hoist attached had no rated load capacity markings on it. 2.Bridgeport Area, Pole K97, on or about 11/9/04: A jib crane with a Budgit 1/2 ton overhead hoist attached had no rated load capacity markings on it. 3.Bridgeport Area, Pole J97, on or about 11/9/04: A jib crane with a Budgit 1/2 ton overhead hoist attached had no rated load capacity markings on it. 4.Bridgeport Area, Pole H95, on or about 11/9/04: A jib crane with a Budgit 1/2 ton overhead hoist attached had no rated load capacity markings on it. 5.Assembly Area, between Poles F73 and G73, on or about 11/10/04: A bridge crane with a CM Lodestar 1/2 ton overhead hoist attached had no rated load capacity markings on it. 6.Assembly Area, between Poles F75 and G75, on or about 11/10/04: A bridge crane with a CM Lodestar 1/2 ton overhead hoist attached had no rated load capacity markings on it. 7.Manual Mills, Pole K41, on or about 11/17/04: A bridge crane with a CM Lodestar 1/2 ton overhead hoist attached had no rated load capacity markings on it. 8.Steel Room, Pole C24, on or about 11/17/04: A 3 ton Shepard Niles underhung crane pendant control function labels were not legible. 9.Work Holding Chuck Cell, Pole F3, at the Hardinge Conquest VMC #2861, on or about 11/17/04: A CM Lodestar 1/2 ton overhead hoist was mounted on a bridge crane structure which was rated for 1/4 ton. Among other methods, feasible and acceptable abatement methods to correct these hazards are to: 1.Mark the rated load on the main structure in accordance with ANSI B30.11-1980, Section 11-1.1.2. 2.Mark the function labels on the pendant controls and keep them legible in accordance with ANSI B30.11-1980, Section 11-2.3.3. 3.Prior to use, ensure the supporting structure is designed to withstand the loads and forces imposed by the hoist for the rated load in accordance with ANSI B30.11-1980, Section 11-2.2.2. Abatement certification must be submitted for item a-4, a-5.