Violation Detail
Standard Cited: 1550035003 Construction Site Power and Hand Tool Rules
Inspection Nr: 307619676
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $400.00
Current Penalty: $400.00
Issuance Date: 05/12/2004
Nr Instances: 4
Nr Exposed: 4
Abatement Date: 04/15/2004
Gravity:
Report ID: 1055320
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate