Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 307613000
Citation: 01001
Citation Type: Serious
Abatement Date: 06/30/2009 I
Initial Penalty: $2,450.00
Current Penalty: $2,450.00
Issuance Date: 06/25/2009
Nr Instances: 3
Nr Exposed: 40
Related Event Code (REC):
Gravity: 10
Report ID: 0215600
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/25/2009 | $2,450.00 | 06/30/2009 | Serious | |
Penalty | Z: Issued | 06/25/2009 | $2,450.00 | 06/30/2009 | Serious |