Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 305875684
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $1,600.00
Current Penalty: $1,600.00
Issuance Date: 11/27/2002
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 12/01/2002
Gravity:
Report ID: 0552700
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
Translate