Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 305499287
Citation: 01001
Citation Type: Serious
Abatement Date: 10/03/2002 I
Initial Penalty: $1,925.00
Current Penalty: $750.00
Issuance Date: 09/30/2002
Nr Instances: 2
Nr Exposed: 5
Related Event Code (REC):
Gravity: 05
Report ID: 0418800
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/23/2002 | $750.00 | 10/03/2002 | Serious | |
Penalty | Z: Issued | 09/30/2002 | $1,925.00 | 10/03/2002 | Serious |