Violation Detail
Standard Cited: 19100036 D02 Design and construction requirements for exit routes.
Inspection Nr: 305186751
Citation: 01001
Citation Type: Serious
Abatement Status: I
Initial Penalty: $525.00
Current Penalty: $525.00
Issuance Date: 11/21/2002
Nr Instances: 6
Nr Exposed: 50
Abatement Date: 11/26/2002
Gravity: 01
Report ID: 0257220
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
Translate