Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 305118473
Citation: 01001
Citation Type: Serious
Abatement Status: I
Initial Penalty: $1,100.00
Current Penalty: $450.00
Issuance Date: 08/13/2003
Nr Instances: 1
Nr Exposed: 9
Abatement Date: 08/18/2003
Gravity: 02
Report ID: 0524700
Contest Date:
Final Order:
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/28/2003 | $450.00 | 08/18/2003 | Serious | |
| Penalty | Z: Issued | 08/13/2003 | $1,100.00 | 08/18/2003 | Serious |
Translate