Violation Detail
Standard Cited: 19100036 D01 Design and construction requirements for exit routes.
Inspection Nr: 304681430
Citation: 01001
Citation Type: Serious
Abatement Date: 05/13/2003 X
Initial Penalty: $2,500.00
Current Penalty: $1,500.00
Issuance Date: 04/24/2003
Nr Instances: 2
Nr Exposed: 26
Related Event Code (REC):
Gravity: 10
Report ID: 0214700
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/14/2003 | $1,500.00 | 05/13/2003 | Serious | |
Penalty | Z: Issued | 04/24/2003 | $2,500.00 | 05/13/2003 | Serious |