Violation Detail
Standard Cited: 95012901
Inspection Nr: 303290134
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $350.00
Current Penalty: $350.00
Issuance Date: 01/26/2000
Nr Instances: 8
Nr Exposed: 3
Abatement Date: 02/13/2000
Gravity:
Report ID: 0453730
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/15/2000 | $350.00 | 02/13/2000 | Serious | |
| Penalty | Z: Issued | 01/26/2000 | $350.00 | 02/13/2000 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard: UNAPEQUIP
North Carolina General Statute 95-129(1) of the Occupational Safety and Health Act of North Carolina: The employer did not furnish to each of his employees conditions of employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees: a)facility; weave room maintenance - monorail system with 1/2 ton budgit hoist has not been load tested. b)facility; warping - monorail system with 1 ton Jet hoist has not been load tested. c)facility; weave room - six monorail systems with 1/4 ton Chester hoists have not been load tested. REFERENCE: ANSI/ASME B30.11-1998; Paragraph 11-2.2.2 Load test (a) New, reinstalled,altered, repaired, and modified equipment should be load tested prior to initial use... NOTE: One feasible and acceptable means of abatement is to have the monorail systems load tested.
Translate