Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 300617537
Citation: 01001
Citation Type: Serious
Abatement Date: 05/28/1998 I
Initial Penalty: $1,250.00
Current Penalty: $467.00
Issuance Date: 05/22/1998
Nr Instances: 1
Nr Exposed: 30
Related Event Code (REC): R
Gravity: 03
Report ID: 0215000
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/24/1998 | $467.00 | 05/28/1998 | Serious | |
Penalty | Z: Issued | 05/22/1998 | $1,250.00 | 05/28/1998 | Serious |