Violation Detail
Standard Cited: 19100269 P01 I Electric Power Generation, Transmission, and Distribution.
This violation item has been deleted.
Inspection Nr: 282091.015
Citation: 01001
Citation Type: Serious
Abatement Date: 07/05/2012
Initial Penalty: $4,200.00
Current Penalty: $0.00
Issuance Date: 06/04/2012
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0522500
Contest Date: 07/18/2012
Final Order: 02/04/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/04/2013 | $0.00 | 07/05/2012 | Serious | |
Penalty | C: Contested | 07/25/2012 | $4,200.00 | 07/05/2012 | Serious | |
Penalty | Z: Issued | 06/04/2012 | $4,200.00 | 07/05/2012 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(p)(1)(i): The critical safety components of mechanical elevating and rotating equipment shall receive a thorough visual inspection before use on each shift. Note: Critical safety components of mechanical elevating and rotating equipment are components whose failure would result in a free fall or free rotation of the boom. a. On the site where tree removal was being performed from a bucket truck, the employer did not perform a thorough inspection of the truck before opoerating the equipment, exposing employees to a fall hazard.