Violation Detail

Standard Cited: 5A0001 OSH Act General Duty Paragraph

Inspection Nr: 2353241

Citation: 01001

Citation Type: Serious

Abatement Status: N

Initial Penalty: $640.00

Current Penalty: $180.00

Issuance Date: 12/19/1985

Nr Instances: 1

Nr Exposed: 6

Abatement Date: 12/22/1985

Gravity:

Report ID: 0521400

Contest Date:

Final Order:

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 12/30/1985 $180.00 12/22/1985 Serious  
Penalty Z: Issued 12/19/1985 $640.00 12/22/1985 Serious  

Text For Citation: 01 Item/Group: 001 Hazard: FALLING

Section 5(a)(1) of the Occupational Safety and Health Act pf 1970: The employer did not furnish employment and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that: painters painting the underside of a four-lane highway bridge were exposed to electric burns, electric shock and electrocution, and to massive traumatic injuries or drowning from falls of up to 70 feet onto railroad tracks and trestles, concrete piers, and to the river and river banks below caused by electric shock while working on bridge bents, ladders and narrow unguardrailed aluminum scaffold stages resting on wire rope bearers stretched parallel to and beneath the steel bridge girders and crossing and crossing directly above and within 15 feet or less of three 7200- volt (to ground) and 12,000-volt (phase-to-phase) uninsulated and fully energized electric conductor cables. A feasible method to abate these hazards must include but is not limited to the following essentials: 1) Prior to starting work on any part of the bridge which crosses above or close enough to such conductors that wire ropes, scaffolds or scaffold parts, ladders, or any other conductive or potentially conductive tools, supplies, materials or equipment could touch such conductors, the electric utility shall be contacted and that work shall not begin until the electric utility has either de-energized and effectively grounded the three conductors on both sides of any potential contact area or blanketed, insulated or otherwise effectively shielded them from all possible contact. 2) Prior to dismantling or removing wire ropes, scaffolds, scaffold part ladders, or any other conductive or potentially conductive tools supplies, materials, or equipment, to assure that the protection provided is still effective and that accidental contact during such operations will not result in ground faults or short circuits.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.