Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1875375.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $13,240.00
Current Penalty: $7,944.00
Issuance Date: 04/29/2026
Nr Instances: 2
Nr Exposed: 1
Abatement Date: 05/26/2026
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 05/20/2026
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/20/2026 | $7,944.00 | 05/26/2026 | Serious | |
| Penalty | Z: Issued | 04/29/2026 | $13,240.00 | 05/26/2026 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): The employer permitted employees to work in close proximity to energized, unguarded, and ungrounded electric power circuits that the employee could contact in the course of their work: Employees performing electrical upgrade work on panel boxes, light switches, and wiring in a pre existing building were exposed to electrical shock hazards because the electrical system was not kept deenergized until all electrical work was completed. (a) On or about November 3, 2025, employees performed work on existing stairway lighting but the circuit was not kept deenergized. (b) On or about January 20, 2026, employees conducted electrical work on a light switch on the roof of Penthouse 3 and 4 but the circuit was not kept deenergized.
Translate