Violation Detail
Standard Cited: 19100269 V01 I Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1869571.015
Citation: 01001
Citation Type: Other
Abatement Status:
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/20/2026
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/24/2026
Gravity:
Report ID: 0317500
Contest Date:
Final Order: 05/06/2026
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/06/2026 | $0.00 | 07/24/2026 | Other | |
| Penalty | Z: Issued | 04/20/2026 | $0.00 | 06/05/2026 | Other |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(v)(1)(i): Interlocks and other safety devices were not maintained in a safe, operable condition. (a) Duquesne Light Company, Arsenal Sub Station: On or about January 21, 2026, the interlock did not operate as designed/intended when a senior operator conducted switching on the 345kV gas buss #2-3 #3 section disconnect.