Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1851419.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $3,015.00
Current Penalty: $1,809.00
Issuance Date: 02/09/2026
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 5
Report ID: 0418400
Contest Date:
Final Order: 02/25/2026
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/25/2026 | $1,809.00 | Serious | ||
| Penalty | Z: Issued | 02/09/2026 | $3,015.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling. (a) In the paint prep area - On or about September 17, 2025, employees were exposed to electrical shock hazards, in that relocatable power taps were not used and installed in accordance with the instructions in the UL listing, where two relocatable power taps were series connected and not individually connected to branch circuit receptacles.
Translate