Violation Detail
Standard Cited: 19100269 Q03 XII Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1841719.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $6,620.00
Current Penalty: $3,972.00
Issuance Date: 01/27/2026
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0627510
Contest Date:
Final Order: 02/17/2026
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 02/17/2026 | $3,972.00 | Serious | ||
| Penalty | Z: Issued | 01/27/2026 | $6,620.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(q)(3)(xii): The employer shall ensure that, before employees elevate the boom of an aerial lift, the employees ground the body of the truck or barricade the body of the truck and treat it as energized. On or about July 31, 2025, employees of Swisher Electric Cooperative, Inc., at or near Valley View Substation, 503 FM 2284, Plainview TX 79072, were engaged in replacing damaged cut-out switches without adequately grounding or barricading their work truck.
Translate