Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1833046.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $16,550.00
Current Penalty: $16,550.00
Issuance Date: 12/23/2025
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 01/15/2026
Gravity: 10
Report ID: 0317000
Contest Date:
Final Order: 01/22/2026
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | Z: Issued | 12/23/2025 | $16,550.00 | 01/15/2026 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): a) Jobsite located at or near 5800 City Ave. Philadelphia, PA- On or about June 24, 2025,. employees conducting masonry activities were utilizing a Franco Act 8 Mast climbing work platform that was not fully planked, on the outrigger section exposing employees to fall hazards of approximately 60 feet.
Translate