Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1811079.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,958.00
Current Penalty: $5,958.00
Issuance Date: 08/19/2025
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity: 10
Report ID: 0214500
Contest Date: 09/03/2025
Final Order:
Related Event Code (REC): I
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | C: Contested | 09/05/2025 | $5,958.00 | Serious | ||
| Penalty | Z: Issued | 08/19/2025 | $5,958.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: A) Elite Concrete NY LLC does not ensure that subcontractors and or other workers working in proximity to energized power lines are protected against electric shock by de-energizing and grounding, effectively guarding, insulating or other means. Between the dates of 12/2/24 through 3/11/25, at 1 Mallory Ave., Jersey City NJ -Slab -Parallel to Mallory Ave., (a): Installation of Concrete Slab - where concrete subcontractor Employee A was exposed to electrocution and electric shock hazards while engaged in the finish of the third floor slab utilizing an alumnimun trowel on a multi-story residential building approximately 6 feet from a power line that was not de-energized and grounded, guarded, insulated or protected by other means.