Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1804699.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,511.00
Current Penalty: $4,300.00
Issuance Date: 08/12/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 08/29/2025
Gravity: 5
Report ID: 0627700
Contest Date:
Final Order: 09/22/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/22/2025 | $4,300.00 | 08/29/2025 | Serious | |
Penalty | Z: Issued | 08/12/2025 | $8,511.00 | 08/29/2025 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. On or about February 14, 2025, and at times prior to, within the north side of the slitter production building at the Red Bud Industries Slitting Line Machine, lockout/tagout procedures were not developed when servicing and maintenance operations were required to be performed.