Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1800723.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $7,093.00
Current Penalty: $7,093.50
Issuance Date: 07/18/2025
Nr Instances: 3
Nr Exposed: 12
Abatement Date: 09/04/2025
Gravity: 1
Report ID: 0625500
Contest Date:
Final Order: 08/12/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/12/2025 | $7,093.50 | 09/04/2025 | Other | |
Penalty | Z: Issued | 07/18/2025 | $7,093.00 | 09/04/2025 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(i)(B):The employer's piping and instrument diagrams (P&IDs) were not accurate. On or about 1/29/2025, at the Lubrizol facility, piping and instrument diagrams (P&IDs) did not accurately reflect the process safety management covered process, including but not limited to: a) P&IDs for reactors (R3, R5, R6, and R7) and knockout pots (stainless steel-SS, glass-G and South plant-SP) do not indicate pipe sizes, pipe materials, assigned P&ID numbers, material flows, and assigned number or name tag for instruments. b) P&ID for Reactor R6 (200-PID-006, Rev. G, date 5/28/2024). i. HV-204 valve was identified incorrectly. ii. Pressure transmitter PT-300 was labeled incorrectly. c) P&ID for Reactor R3 (200-PID-005, Rev. B, date 5/28/2024). Pressure transmitter PT-300 was labeled incorrectly.