Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1799550.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $156,052.00
Current Penalty: $156,052.00
Issuance Date: 04/03/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 04/15/2025
Gravity: 5
Report ID: 0215800
Contest Date:
Final Order: 04/28/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/28/2025 | $156,052.00 | 04/15/2025 | Serious | |
Penalty | Z: Issued | 04/03/2025 | $156,052.00 | 04/15/2025 | Willful |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) M21, Marion Line Case Stacker, Seneca Foods Corporation, 100 Gambee Road, Geneva, NY, 14456, on or about 1/17/2025; A production manager directed a maintenance employee to replace rollers on the transfer plates on the Marion Line Case Stacker without utilizing the energy control procedure, the electrical energy was not isolated while the employee performed the repair.