Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1798457.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,585.00
Current Penalty: $11,585.00
Issuance Date: 04/18/2025
Nr Instances: 1
Nr Exposed: 14
Abatement Date: 05/14/2025
Gravity: 10
Report ID: 0521700
Contest Date:
Final Order: 05/14/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/14/2025 | $11,585.00 | 05/14/2025 | Serious | |
| Penalty | Z: Issued | 04/18/2025 | $11,585.00 | 05/14/2025 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point of operation guards were not designed and constructed as to prevent the operator from having any part of their body in the danger zone during the operating cycle: a) Molding Department- On or about January 17, 2025, employees working with the air pressure machine "A" were required to make adjustments to the machine at the point of operation. The employer did not ensure that point of operation guards were designed and constructed as to prevent the operator from having any part of their body in the danger zone, when the guard was broken, and falling off. b) Molding Department- On or about January 17, 2025, employees working with the air pressure machine "A47" were required to make adjustments to the machine at the point of operation. The employer did not ensure that point of operation guards were designed and constructed as to prevent the operator from having any part of their body in the danger zone, when the guard was broken, missing 2 screws. c) In the Molding Department -On or about January 17, 2025, the employer did not ensure that all guards on machines, such as air press machine "A38", were completely affixed and/or secured."