Violation Detail
Standard Cited: 19260600 A06 I Equipment.
Inspection Nr: 1798420.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $16,550.00
Current Penalty: $16,550.00
Issuance Date: 07/10/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0419400
Contest Date:
Final Order: 08/05/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 07/10/2025 | $16,550.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.600(a)(6)(i): For lines rated 50kV or below, a minimum of 10 feet was not maintained between the energized line and the equipment. (a) 9700 W. Oaklawn Rd. Biloxi, MS. - On or about January 17, 2025, the employer did not ensure that employee(s) operating concrete boom pump trucks maintained a 10 feet clearance from energized electrical lines.