Violation Detail
Standard Cited: 19100305 B01 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1797795.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,462.00
Current Penalty: $5,462.00
Issuance Date: 06/18/2025
Nr Instances: 1
Nr Exposed: 20
Abatement Date:
Gravity: 1
Report ID: 0316700
Contest Date:
Final Order: 07/16/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 06/18/2025 | $5,462.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.305(b)(1)(i): Openings through which conductors entered cutout boxes, cabinets, or fittings were not effectively closed: (a) 156 West Harrisburg Ave, Elizabethtown, PA; Packaging/Production Room - On or about January 14, 2025, the cutout where the electrical cable from the MCC entered the transformer was exposed. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.