Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 17925777
Citation: 01001
Citation Type: Serious
Abatement Date: 06/29/1994 X
Initial Penalty: $525.00
Current Penalty: $262.50
Issuance Date: 05/27/1994
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 01
Report ID: 0112300
Contest Date:
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/23/1994 | $262.50 | 06/29/1994 | Serious | |
Penalty | Z: Issued | 05/27/1994 | $525.00 | 06/29/1994 | Serious |