Violation Detail
Standard Cited: 19260251 D06 III Rigging equipment for material handling.
Inspection Nr: 1786247.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $16,550.00
Current Penalty: $16,550.00
Issuance Date: 04/29/2025
Nr Instances: 1
Nr Exposed: 5
Abatement Date:
Gravity: 10
Report ID: 0625500
Contest Date: 05/30/2025
Final Order: 09/12/2025
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 09/12/2025 | $16,550.00 | Other | ||
| Penalty | C: Contested | 05/30/2025 | $16,550.00 | 05/19/2025 | Serious | |
| Penalty | Z: Issued | 04/29/2025 | $16,550.00 | 05/19/2025 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
1926.251(d)(6)(iii): Removal from service. Natural and synthetic fiber rope slings shall be immediately removed from service if broken or cut fibers are present: On or about November 12, 2024, synthetic slings were not removed from service as required.