Violation Detail
Standard Cited: 19100147 C06 I C The control of hazardous energy (lockout/tagout).
Inspection Nr: 1785224.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,857.00
Current Penalty: $5,142.75
Issuance Date: 11/27/2024
Nr Instances: 1
Nr Exposed: 11
Abatement Date: 12/20/2024
Gravity: 5
Report ID: 0213600
Contest Date:
Final Order: 12/12/2024
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/12/2024 | $5,142.75 | 12/20/2024 | Serious | |
| Penalty | Z: Issued | 11/27/2024 | $6,857.00 | 12/20/2024 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i)(C): Where lockout was used for energy control, the periodic inspection did not include a review, at least annually, between the inspector and each authorized employee, of that employee's responsibilities under the energy control procedure being inspected: a) On or about 10/29/2024 throughout the establishment; where the last documented periodic review of authorized employees performing lockout procedures on machines such as, but not limited to: injection molding machines, was in 2021. ABATEMMENT CERTIFICATION REQUIRED
Translate