Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1784422.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $16,550.00
Current Penalty: $10,350.00
Issuance Date: 03/13/2025
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 10
Report ID: 0215000
Contest Date: 04/07/2025
Final Order: 10/06/2025
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 10/06/2025 | $10,350.00 | Serious | ||
| Penalty | C: Contested | 04/11/2025 | $16,550.00 | Serious | ||
| Penalty | Z: Issued | 03/13/2025 | $16,550.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. Location: a) Worksite; Floor LL1, Fan Room AC-2 a) On or about 10/8/2024, lockout/tagout (LOTO) procedures were not utilized for the control of potentially hazardous energy when employees were engaged in replacing a condenser water pump for an air conditioning unit.
Translate