Violation Detail
Standard Cited: 19260451 C02 V General requirements.
Inspection Nr: 1783847.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,965.00
Current Penalty: $3,723.75
Issuance Date: 03/12/2025
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0626000
Contest Date:
Final Order: 04/10/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 04/10/2025 | $3,723.75 | Serious | ||
| Penalty | Z: Issued | 03/12/2025 | $4,965.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(c)(2)(v):Fork-lifts were used to support scaffold platforms in which the entire scaffold platform was not attached to the fork and the fork-lift was moved horizontally while the platform was occupied: On or about October 24, 2024, and at times prior thereto, an employee worked from a job made wooden box scaffold that was not attached to the forks of forklift.
Translate