Violation Detail
Standard Cited: 19260652 D02 Requirements for protective systems.
Inspection Nr: 1782187.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,052.00
Current Penalty: $4,936.40
Issuance Date: 12/19/2024
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 01/06/2025
Gravity: 5
Report ID: 0523900
Contest Date:
Final Order: 01/27/2025
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/27/2025 | $4,936.40 | 01/06/2025 | Serious | |
| Penalty | Z: Issued | 12/19/2024 | $7,052.00 | 01/06/2025 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.652(d)(2): Manufactured materials and equipment used for protective systems were not used and maintained in a manner that was consistent with the recommendations of the manufacturer: (a) Excavation site located on the shoulder of WI-37, Mondovi; On or about October 16, 2024, only three of the four required spreader bars were installed between the sidewall panels of a 24-foot long x 8-foot high trench shield before it was installed and used to provide cave-in protection in an excavation that ranged in depth from 10-feet, 11-inches to 10-feet, 5-inches.