Violation Detail
Standard Cited: 19100037 B02 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1782128.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,457.00
Current Penalty: $5,674.20
Issuance Date: 04/14/2025
Nr Instances: 1
Nr Exposed: 24
Abatement Date: 05/01/2025
Gravity: 5
Report ID: 0626600
Contest Date:
Final Order: 05/14/2025
Related Event Code (REC): R
Emphasis:
Substance: 2150
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/14/2025 | $5,674.20 | 05/01/2025 | Serious | |
Penalty | Z: Issued | 04/14/2025 | $9,457.00 | 05/01/2025 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.37(b)(2): Each exit was not clearly visible and marked by a sign reading "Exit". On or about October 18, 2024 and at prior times, at the RapidXchange Production Facility in Brookshire, Texas, the doorway on the east facing wall, of the office building, leading to the eastern side of the building and parking lot was not marked by a sign reading "Exit".