Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1779677.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $16,550.00
Current Penalty: $11,585.00
Issuance Date: 04/02/2025
Nr Instances: 3
Nr Exposed: 4
Abatement Date: 05/28/2025
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 04/29/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/29/2025 | $11,585.00 | 05/28/2025 | Other | |
Penalty | Z: Issued | 04/02/2025 | $16,550.00 | 04/28/2025 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) On or about October 3, 2024, and at times prior thereto, in the production area, energy control procedures were not inspected periodically for Cartoner machine 80. b) On or about October 3, 2024, and at times prior thereto, in the production area, energy control procedures were not inspected periodically for Cartoner machine 61. c) On or about October 3, 2024, and at times prior thereto, in the production area, energy control procedures were not inspected periodically for Cartoner machine 66.