Violation Detail
Standard Cited: 19100147 C06 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1778187.015
Citation: 01001
Citation Type: Serious
Abatement Date: 02/10/2025 2
Initial Penalty: $6,453.00
Current Penalty: $6,453.00
Issuance Date: 01/06/2025
Nr Instances: 1
Nr Exposed: 50
Related Event Code (REC):
Gravity: 5
Report ID: 0111700
Contest Date:
Final Order: 01/30/2025
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 01/06/2025 | $6,453.00 | 02/10/2025 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(ii): The employer did not certify that periodic inspections of the energy control procedures had been performed: Location: Site. On or about September 27, 2024, the employer failed to conduct periodic inspections of the lockout-tagout procedures for the sawmill, planer mill, sorting equipment, and vehicular equipment.